Solutions
Industrial safety
Gas, heat and people in hazardous areas, with the site's protocol.
What it solves
The emergency protocol usually lives in a folder. When the alarm sounds, whoever is on shift does what they remember, and what they remember depends on how long they have held the post.
What gets measured here
Every signal, with the standard behind it
10 % LEL
First warning · 20 % evacuate · the threshold is the compound's, not a generic one
Concentración de gas
Detector reading in ppm or as a percentage of the lower flammable limit, with the compound's own threshold rather than a generic one.
LEL · OSHA PEL · NIOSH IDLH1 ppm
H₂S · CO 25 · NH₃ 25 · Cl₂ 0.5 — the Mexican standard's own
Exposición ocupacional
The exposure limit that applies in Mexico for each substance, not one copied from another country.
NOM-010-STPS-2014> 15 K
Over the twin component · 4–15 scheduled · 1–3 investigate
Punto caliente eléctrico
ΔT over the reference decides the action class. An absolute degree says nothing without its comparison.
NETA MTS · NFPA 70B
The full catalogue is 311 standards across fourteen domains, and it lives inside the platform — next to the field where the number goes — not in an appendix to the manual.
A concrete case

The classified zone is watched without entering it
The value of a fixed camera in a pump room is not that it records: it is that it measures without anyone having to walk into a hazardous atmosphere to take a reading. The motor crossed its seventy-degree limit at three in the morning and the alert went out by itself. At that hour there is no round.
Temperature in a classified zone
IEC 60079 · NFPA 70BMeasuring without entering. The watching equipment stays outside the zone and whoever works inside takes no readings by hand.
Hot spot against its limit
NETA MTS 100.18The motor at 92.4 °C against a 70 °C limit. The alarm is not triggered by a colour: it is triggered by a degree against a threshold with a standard.
Gas leak detection
EPA Method 21The plume is seen before it reaches the point detector, and the record says where it was and at what time.
The protocol arrives with the alarm
The steps that appear are the ones for that site, that role and that hazard level, with the standard behind them and the clock running. Not a generic checklist.