Plants where one unplanned stop costs more than everything else combined.

What it solves
The cost of a motor is not the motor: it is the shift that did not produce while it was being replaced.
What gets measured here
Every signal, with the standard behind it
155 °C
Class F · B 130 · H 180 · reference ambient 40
Temperatura de motor
By the winding's insulation class. A class F motor isn't judged by a class B limit.
IEC 60034 · NEMA MG-12.8–4.5 mm/s
A/B boundary by group · zone C watch · zone D stop
Vibración de máquina
Millimetres per second mapped to action zones by size and mounting.
ISO 10816-3Uniformidad de horno
Spread between zones and setpoint adherence — what decides whether the batch passes.
SEPTEM process scale> 15 K
Over the twin component · 4–15 scheduled · 1–3 investigate
Tablero eléctrico
ΔT over the reference phase, with the matching action class.
NETA MTS
The full catalogue is 396 standards across fifteen domains, and it lives inside the platform — next to the field where the number goes — not in an appendix to the manual.
A concrete case

An oven is not judged by its peak temperature
The tunnel oven is the clearest example of why the hottest point is no diagnosis. An oven is hot: that is its job. What decides whether the batch passes is the PROFILE — how even it is from zone to zone and how far it drifts from the setpoint. An oven with its peak in range and a cold zone at the inlet turns out raw product down one side of the belt.
Uniformity across zones
SEPTEM process scaleThe spread between the oven's zones. It is the figure that says whether product comes out even, and the one a customer audits.
Setpoint adherence
SEPTEM process scaleHow far each zone drifts from its target, with the sign: over or under. A correct average can hide both.
Profile drift over the shift
ISO 18434-1How the profile changes across the shift. A degrading element does not fail at once: the profile tilts over weeks.
Avoided downtime, counted
When a predictive alarm ends in a work order before the failure, it is recorded as avoided downtime. That is the number that justifies the system next year.