Manufacturing
Plants where one unplanned stop costs more than everything else combined.

What it solves
The cost of a motor is not the motor: it is the shift that did not produce while it was being replaced.
What gets measured here
Every signal, with the standard behind it
155 °C
Class F · B 130 · H 180 · reference ambient 40
Temperatura de motor
By the winding's insulation class. A class F motor isn't judged by a class B limit.
IEC 60034 · NEMA MG-12.8–4.5 mm/s
A/B boundary by group · zone C watch · zone D stop
Vibración de máquina
Millimetres per second mapped to action zones by size and mounting.
ISO 10816-3Uniformidad de horno
Spread between zones and setpoint adherence — what decides whether the batch passes.
AMS2750 · ISO 13579> 15 K
Over the twin component · 4–15 scheduled · 1–3 investigate
Tablero eléctrico
ΔT over the reference phase, with the matching action class.
NETA MTS
The full catalogue is 311 standards across fourteen domains, and it lives inside the platform — next to the field where the number goes — not in an appendix to the manual.
A concrete case

An oven is not judged by its peak temperature
The tunnel oven is the clearest example of why the hottest point is no diagnosis. An oven is hot: that is its job. What decides whether the batch passes is the PROFILE — how even it is from zone to zone and how far it drifts from the setpoint. An oven with its peak in range and a cold zone at the inlet turns out raw product down one side of the belt.
Uniformity across zones
AMS2750 · ISO 13579The spread between the oven's zones. It is the figure that says whether product comes out even, and the one a customer audits.
Setpoint adherence
ISO 13579How far each zone drifts from its target, with the sign: over or under. A correct average can hide both.
Profile drift over the shift
ISO 18434-1How the profile changes across the shift. A degrading element does not fail at once: the profile tilts over weeks.
Avoided downtime, counted
When a predictive alarm ends in a work order before the failure, it is recorded as avoided downtime. That is the number that justifies the system next year.